Mobirise Website Builder

Problem solving design and manufacture

HOLISTIC ANALYSIS

Identifying the problems and pinch points in your product or process

SOLUTION INNOVATION

Taking a new look to resolve your issues through a multi-disciplinary process 

PRODUCT DESIGN & MANUFACTURE

Creating new products from inception to delivery to fulfill your business needs

New Cobotic Pothole Patcher Concept

Mobirise Website Builder

Example

Advanced Tunnel Grouting System

Mobirise Website Builder
Mobirise

An improved, closed-loop control system was designed, utilising state-of-the-art electro-magnetic flow meters, and inverter controlled electric pumps. As the system was critical to the tunnelling operation, a three-level control fall-back methodology was employed and 3D Solid Modelling used to ensure that the equipment would fit effectively into a very constrained space envelope, whilst still allowing the pumps to be easily maintained. The whole project was completed in 6 weeks from inception to delivery, and ensured the 3.6m diameter 5Km long tunnel drive was completed ahead of schedule, by preventing delays due to grout quality issues or breakdowns.

 

A major tunnelling contractor had operational problems with filling the void behind tunnel segment rings using a cementitious grout and setting accelerator. Their existing equipment employed two eccentric screw pumps, one supplying grout and the other accelerator, operating on a fixed speed ratio between the two. However, this open-loop control resulted in a large variability of the filling material proportions due to back-pressure and pump wear, resulting in quality control delays to the tunneling operation. 

To find out more, please get in touch.

info@jsc-design.co.uk